[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

dam-l (Fwd) Mozambique hydro study/LS




------- Forwarded Message Follows -------
Date sent:      	Mon, 19 Apr 1999 12:49:55 +0100
From:           	lori@irn.org (Lori Pottinger)
Subject:        	Mozambique hydro study/LS
To:             	irn-safrica@igc.org

This is from the hyddo-industry publication "Hydropower Review 
Worldwide"
(March 1999):

Mozambique launches Zambezi River feasibility study

Mozambique has taken a major step in the proposed US$3 billion 
development
of up to 2100MW of hydropower on the Zambezi River. The 
government signed
a contract in January witha joint venture led by Hahmeyer 
International of
Germany to conduct a feasibility study of two proposed hydro 
projects: a
new 1400- to 1600-MW Mepanda Uncua project, and Cahora 
Bassa North, a
500-MW expansion of the existing 2040-MW Cahora Bassa plant. 
Most of the
new power would be exported to South Africa on a new 400-KV 
transmission
line.

END

::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
      Lori Pottinger, Director, Southern Africa Program,
        and Editor, World Rivers Review
           International Rivers Network
              1847 Berkeley Way, Berkeley, California 94703, USA
                  Tel. (510) 848 1155   Fax (510) 848 1008
                        http://www.irn.org
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::


Dianne Murray, Coordinator/Webmistress
Dam-Reservoir Working Group; Ottawa, Canada
Dam-Reservoir Impacts and Information Archive
http://www.sandelman.ottawa.on.ca/dams